Emergency preparation and rescue measures for high rise residential buildings

(1) General requirements

the project emergency preparation and rescue measures should aim at potential occupational health and safety accidents or emergencies, and ensure that in case of accidents or emergencies, there are response procedures to deal with, so as to reduce the impact of accidents or emergencies and reduce losses. The main emergency items of the project are: strong typhoon, fire and personal casualty accidents (including poisoning)

for the strong typhoon emergency, the technology department is responsible for preparing the rainy season construction scheme and measures, the material department is responsible for purchasing rain proof, wind proof and power cut proof materials and storing emergency food, and the safety management department is responsible for the specific implementation, and organizing the anti taiwan volunteer group. The project typhoon prevention emergency plan shall be implemented after being reviewed and approved by the general contracting project manager

for fire emergency matters, the technology department is responsible for preparing the project fire protection scheme and fire protection plan (which can also be used as the chapter of the construction organization design) in combination with the construction organization design. The material department is responsible for the purchase, allocation and acceptance of the fire protection materials, the safety management department is responsible for the use and management of the fire protection materials, and organizes the establishment of the project volunteer fire brigade. The fire protection plan and fire protection plan shall focus on the preparation of emergency preparation and response measures for fire protection work in inflammable and explosive areas such as material warehouse and oil depot. The plan and plan shall be implemented after being approved by the general contracting project manager and the director of security inspection

the safety management department is responsible for preparing the emergency plan for personal injury and poisoning accidents and establishing the first-aid measures and management system. There should be a medical room at the scene, marked at the door, equipped with doctors and nurses, and equipped with first aid kit and stretcher. After a safety accident occurs at the construction site, the injured shall be sent to the clinic immediately for treatment, and sent to the hospital for treatment if necessary. The first-aid kit in the clinic must be kept by a specially assigned person, and it is not allowed to lock. The dressings and expired drugs that exceed the disinfection period should be replaced regularly, and they should be supplemented in time after each emergency. At the same time, establish external emergency contact information and transportation security measures, and the safety management department is responsible for the supervision and management of the implementation of this work. The emergency plan for personal injury accidents of the project shall be implemented after being reviewed and approved by the general contracting project manager

common items: stretcher, thermometer, sphygmomanometer, stethoscope, oxygen bag, disposable syringe, infusion device, emergency light and flashlight

the safety management department is responsible for organizing anti Taiwan, fire drill and on-site casualty first aid drill at appropriate time to verify the skills of corresponding personnel, the integrity of equipment and instruments, the effectiveness of emergency measures and the smooth communication channel. The contents of the on-site drill mainly include: promptly notifying relevant units and personnel, rescuing (fire fighting, on-site first aid for the wounded), evacuation and evacuation, protecting important property, closing the site, etc. The project safety and civilized construction management department shall complete and keep records (including live photos of on-site exercises)< (2) emergency plans 1. Emergencies and emergencies prevent and control emergencies such as natural disasters, diseases and major man-made safety incidents, so as to reduce their impact on construction, production and operation, workers’ work and life, and the public an emergency response team is set up in the site management department. The emergency response team is composed of general contracting project manager, deputy project manager, safety inspection director, department head, professional technical head and other relevant department personnel. The general contracting project manager is the first person in charge of the emergency response team, and serves as the leader of the emergency response team. The deputy project manager, security inspection director and department head are the deputy leaders of the emergency response team once an emergency is confirmed, the emergency team will start immediately