1n winter construction, the measures of waterproof, antiskid, antifreeze, gas poisoning and windproof occupational health and safety are mainly formulated< (1) strengthen the fire prevention occupational health and safety education, and improve the fire prevention awareness of all staff. According to the characteristics of fire prevention in winter construction, targeted education and examination should be conducted for electric welders, painters, electricians, management personnel and on duty personnel before winter (2) during winter construction, combustible materials are not allowed to be used as thermal insulation materials for key projects, high-rise buildings and projects that are not easy to put out after fire, and non combustible or refractory materials should be used for thermal insulation (3) in winter construction, after the positioning of thermal insulation materials, all operations with fire and electricity are prohibited, and lighting lines and lamps should be far away from combustible thermal insulation materials (4) in winter construction, after the use of thermal insulation materials, they should be cleaned at any time and stored in a centralized way (5) heating should be used as far as possible in winter construction. 1f a stove is used, a plan and fire prevention measures must be put forward, and fire can be fired only after the approval of the fire protection department. However, it is forbidden to use a stove for heating in paint and seasoning room, carpentry room, material warehouse and decoration stage using polymer decoration materials (6) all kinds of furnaces should be equipped with fire stops higher than the furnace stack according to the needs, and the distance between the furnace stack, chimney, outlet and power line and electrical equipment should be more than 50cm (7) the fire must be guarded by a specially assigned person who has received the general knowledge of occupational health, safety and fire protection. The watchman must carry out the duty system and operation procedure. Fire fighting equipment must be prepared on each floor during construction< (1) in winter construction, the frost, ice and snow on the working surface such as passageway should be cleared in time before construction (2) in winter construction, the snow on the steel pipe must be removed before the on-site scaffold is erected and improved, and the construction can be carried out after frost and ice melting (3) in winter construction, if the anti-skid strip of the passage is damaged, it should be repaired in time< (1) before winter, thermal insulation materials shall be prepared in advance according to the material requirements of winter construction scheme, and thermal insulation measures shall be taken for the materials and working surfaces that are afraid of freezing at the construction site according to the technical requirements (2) underground fire hydrants should be installed as far as possible in winter construction sites. A water test should be conducted before winter, and a small amount of lubricating oil should be added this article is reprinted by 1nternet media, which only represents the author’s point of view and has nothing to do with China labor insurance network. 1f the information column articles and comments violate your legal rights, please call to let us know and we will deal with them in time
Occupational health and safety measures for winter construction
21
Jul