PPE

State Grid Chongqing Chengkou power supply: weaving anti violation safety net

On April 13, the safety and quality inspection team of the leading cadres and managers of State Grid Chengkou county power supply company went to the spring inspection and infrastructure construction sites to comprehensively investigate and deal with the “three violations” phenomenon, and exposed the unsafe behaviors at the sites

supervise and urge the on-site construction operation to strictly implement the “seven measures” of safety control:

first, the personnel of each production unit and construction team must participate in the safety knowledge training organized by the company

the second is to strengthen the on-site safety management and control, and investigate the responsibility for violation of regulations

the third is to strengthen the construction and maintenance site organization and the implementation of technical measures< Fourth, before and after work, all units must organize personnel to hold pre shift and post shift meetings to publicize and implement the possible danger points and preventive measures to each member of the work class fifthly, the safety tools and labor protection articles used on site shall be strictly inspected item by item before work, and the use of unqualified safety tools and instruments on site is strictly prohibited< Sixth, all units must organize operators to carry out on-site investigation on the scope of power outage, the live parts reserved, the conditions of the operation site, the environment and other dangerous points before starting the work seventh, after the equipment operation and maintenance unit and the construction and maintenance unit finish their on-site work, both parties shall jointly inspect the construction site to ensure that the on-site safety tools, construction surplus materials, etc. are cleaned up, and the work order can be completed only after all the “safety measures” arranged on the site are removed. Once the work order is terminated, it is strictly forbidden for maintenance or construction personnel to climb the tower or return to the site to continue to work, and the subsequent accidents caused by it are firmly prohibited it is reported that in the next stage, Chengkou company will carry out special treatment to prevent the occurrence of accidents in view of the extremely heavy maintenance task before summer, the large amount of power grid operation, and the frequent occurrence of personal accidents and personnel responsibility accidents this article is a reprint of 1nternet media, which only represents the author’s point of view and has nothing to do with this website. 1f the information column articles and comments violate your legal rights, please call to let us know and we will deal with them in time

Back to list